PG Power Group

Powered land · Power equipment · Energy storage

From raw land to neocloud handover.

PG Power Group is the one partner that takes a site from raw land to energized handover. We secure land with existing high-voltage infrastructure, document the path to utility power, and source the verified equipment and battery storage that bridge the gap until the grid connection is ready. Active in Pennsylvania, Kentucky and Tennessee.

UTILITY 69 kV 52-1 XFMR 69 / 13.8 kV BUS 13.8 kV LAND EQUIPMENT STORAGE

Site scale

10–100+ MW

Transmission

69–138 kV

Site size

20–500+ acres

Markets

PA · KY · TN

Services

Three feeders off one bus

Power is the constraint on every new data center and storage project. We work the three pieces that decide how fast a site can energize: the land, the equipment and the storage.

Feeder 1

Powered land development

We find sites that already have high-voltage infrastructure nearby, secure them, and turn a utility conversation into a written path to service.

  • We look forFormer industrial sites, substations on or beside the parcel, dual feeds, room for 10–100+ MW.
  • We verifyUtility capacity in writing, zoning, FEMA flood zones, water, rail, title and access easements.
  • Deal structuresOption, purchase, assignment or joint venture with the landowner.
  • We deliverAn offtake-ready site with its power path documented, ready for a buyer's diligence.
Feeder 2

Verified power equipment

New transformers and gas turbines carry multi-year lead times. Through reseller relationships with surplus marketplaces, we source new, surplus and used units across North America and arrange independent testing before anyone commits.

  • TransformersPad-mount and containerized MV units, and 10–40 MVA power transformers.
  • Switchgear15 kV and 38 kV class gear, protection and metering.
  • GenerationDiesel and gas gensets for backup and bridge power; turbines for behind-the-meter supply.
  • TestingOil and dissolved-gas analysis, turns ratio, insulation and PCB checks; load-bank tests on gensets.
Feeder 3

Battery energy storage

As a channel partner to storage manufacturers, we match battery systems to sites and loads, for backup, peak management and faster interconnection.

  • ApplicationsData center backup and ride-through, peak shaving, bridge capacity while utility upgrades finish.
  • InterconnectionMedium-voltage step-up transformers and switchgear sized to the system.
  • Relocatable systemsContainerized, mobile BESS that can move with the load and skip much of the permanent civil work.
  • SitesLand with an interconnection position or existing capacity rights.

How we work

From raw land to handover

  1. STEP 1

    Screen

    Desktop review of power, flood, zoning and access before anyone spends money.

  2. STEP 2

    Confirm power

    Formal utility request and a written response on capacity and timing.

  3. STEP 3

    Package

    Site control, documented diligence, and equipment matched to the load.

  4. STEP 4

    Hand over

    Site, power path and equipment handed to the operator, with EPC and storage partners lined up.

Who we work with

  • Neoclouds and GPU operatorsSites, power and bridge equipment for 10–100+ MW deployments, handed over ready to build.
  • Data center developersPowered land and long-lead equipment.
  • BESS developersSites, step-up transformers and switchgear.
  • Equipment partnersSourcing and selling transformers, switchgear, generators and turbines. New and verified used units.
  • LandownersOwn a parcel with high-voltage lines or a substation? We option, buy or partner. We want to hear about it.

The firm

Power first, then land

PG Power Group is a power-led development firm. We start every site with the utility question, not the real estate one, and we bring the equipment and storage partners needed to get a load energized on schedule. One counterparty from raw land to handover.

Veteran-owned Real estate development Utility interconnection Equipment reseller BESS channel partner

Have a site, a load, or a unit to move?

Tell us the location, the megawatts, the equipment you need or have to sell, and the timeline. We reply within two business days.

Email

info@pgpowergroup.com

Write to us